We’re hiring up to six Complete Streets Technicians to implement Complete Streets pop-up projects in WNY.
We believe diversity, equity and inclusion will make our organization and our region stronger. Our advocacy work is part of our ongoing commitment to increase our engagement with people and communities that are currently underrepresented in the cycling community and within our organization.

About
We promote active biking, walking and transit, trails and greenways, and complete streets in Western New York. We work directly with and connect communities through advocacy, education, planning, projects, and engagement. Our complete streets work includes building temporary pop-up healthy streets initiatives like crosswalks, bike lanes, and other street features using paint and construction materials.
Job Description
In an effort to make our roads safer for everyone, we are looking for additional support for pop-up healthy streets initiatives in Buffalo. The Complete Streets Technician will assist in the implementation of complete streets pop-up projects. These are on-street, short term infrastructure projects, from repainting and reconfiguring crosswalks and refreshing bike lanes, to more playful temporary projects to make streets a safe and fun place for connecting with neighbors. The complete streets technician will be responsible for volunteer coordination, and project implementation, from set-up to project build and clean-up.

Key responsibilities include:
- Work with the operations and outreach director to implement pop-up Healthy Streets Initiatives (HSI), including setting up stencils, painting crosswalks, installing delineator posts and rubberform curbing. Work specifically entails operating battery- and gas-powered machinery such as a double paint striper, leaf blower, hammer drill. Operating manual tools like paint rollers, paint brushes, brooms, screw drivers, sledge hammers.
The Complete Streets Technician should have:
- Ability to stand for eight hours and work outside. Pop-up project implementation can by physically-demanding
- Ability to lift weight of 50 lbs
- Experience and/or comfort teaching, leading groups and/or working with volunteers
- Basic knowledge of traffic and bicycle rules and regulations (training available)
- Comfort talking with patience to the general public as their normal traffic pattern is disrupted by our work
- Ability to work independently as well as part of a team
- Demonstrated ability to work across racial, ethnic, gender, class and ability differences
- Enthusiasm to come to work and make a difference in Buffalo.
Compensation is $30/hour.
Work may be sporadic. Our work on various intersections requires permit approval from municipal Public Works and Engineering departments. We plan to begin our work in May 2026, but pending permit approval keeps that timeline general. Additionally, if it is raining, or if rain is in the forecast, work will be postponed until the next dry day in the forecast so that paint can dry quickly.
Rough estimate of employment is 180-220 hours. Guaranteed work involves pop up implementation projects that will change the traffic patterns of East Delavan Avenue and Kensington Avenue, using temporary bollards and rubberform, and paint. There is additional implementation work in WNY that we are developing now, but Complete Streets Technicians should plan on a general timeframe of August and September, 2026.
Typical hours will be worked between 8:00 a.m. and 4:00 p.m., weather dependent.
If you would like to be considered for this position, please submit a resume and a short statement as to why you are excited about this opportunity to Brian Dold at hello@gostreetsllc.com. Applications will be reviewed on a rolling basis.
